Had some UPS issues and router issues so took the time to update my website router and streaming website relays system as well
August 11, 2022
by dhoytt
0 comments
August 11, 2022
by dhoytt
0 comments
Had some UPS issues and router issues so took the time to update my website router and streaming website relays system as well
October 19, 2020
by dhoytt
0 comments
I have moved everything around placing the large UPS’ in the rack and moving my FreeNAS systems and older R710 systems in the above them. I still have quite a bit to do like more cable management in incremental stages. … Continue reading
October 18, 2020
by dhoytt
0 comments
Taking the entire site down to restructure my systems and UPS physically in my computer room. This means every systems and site is being taken down and all power cables re-routed.
October 4, 2020
by dhoytt
0 comments
I have my new HPE bl460c gen8 blade systems now in my existing virtual hypervisor XCP-Ng pool with my Dell Poweredge R710’s systems temporarily while I assess them. I need to keep them running see how they handle the loads, … Continue reading
January 27, 2019
by dhoytt
0 comments
Updated one of my Liebert GTX UPS and the extension cabinet. Did this earlier than I wanted since the UPS went into total failure as it seems all the batteries have reached end of life obviously as evidenced by the … Continue reading
January 22, 2018
by dhoytt
0 comments
Well my site went down after I made some local network changes on my switches to get better local throughput on my switches to take advantage of my new Gigabit internet speed that was looking slow on my workstations in … Continue reading
June 27, 2016
by dhoytt
0 comments
I rebuilt my XenServer slave tonight after it didn’t come back up properly last week after a power failure where I decided to ride it out on my UPS and not properly shutdown a few of my systems. The only system that … Continue reading
March 24, 2016
by dhoytt
0 comments
My UPS’s I updated and put into working order a couple of weekends ago are operating just fine though I may get one more just to spread the load out a bit better. I have 2 Liebert GXT2-1500rt120 and 1 GXT2-1000 each … Continue reading
July 4, 2013
by dhoytt
0 comments
Well I overloaded the circuit with te number of systems I had on it and didn’t have my UPS on so it took down my site and support systems. I had some of my new systems I had built plus … Continue reading
June 12, 2012
by dhoytt
0 comments
Had an area wide power outage and now back up and running after getting the systems back up. I do need to update the batteries in my UPS battery backup systems though!