Putting Systems Back on UPS Battery Backup System

| 0 comments

I will be taking down the systems to move them on the UPS battery backup systems that I placed updated new batteries in some time ago. I got so busy that I had overlooked placing the systems back on the UPS system after it was fully charged.

With the recent power outage the other day and the brief power spike this morning I looked over to see that my primary UPS system was up and running all green with no load  begging to be put to use. I placed my monitoring system, backup web server/development system and the multiplayer system on as a test.

I also began testing out some of my other rack mount UPS battery backup systems that I will place replacement backup batteries in as needed. I may test the tower UPS battery backup systems I have as well.

Well in about 5 – 10 minutes I will be bringing down the environment and moving them on the primary UPS systems. This should not take long as I just need to plugin three PDU’s (power distribution units) into the back of the UPS after taking the systems down graefully.

Enhanced by Zemanta

Leave a Reply

Required fields are marked *.